THE LEADING POSITION IN URBAN INFRASTRUCTURE DEVELOPMENT CONSULTING OF ODA PROJECTS

Established from consulting on water supply and environmental projects, during over 20 years of operation, Halcom Vietnam has provided consulting services for many large projects on urban renovation, upgrading and development, water supply and drainage, transportation, environment and resettlement, etc. The company has affirmed its leading position in consulting in urban infrastructure and sustainable development, which has been recognized by international organizations such as the World Bank (WB), Asian Development Bank (ADB) and Ministry of Foreign Affairs of Finland (MFA), etc., and become one of the few domestic companies that can lead the international bidding joint venture and win the bid in ODA projects since more than ten years ago.

Halcom Vietnam can provide almost all types of consulting services for the entire project cycle following the WB or ADB model, from project formulation to Feasibility Study, detailed design, contract management  and construction supervision as well as sustainable development consulting services such as socio-economic survey, safe policy formulation, resettlement, environmental impact assessment and communication, community awareness raising.

This is affirmed through more than 400 consulting service contracts for infrastructure & urban development projects funded by the World Bank, ADB and Finland, Japan, etc. in all 63 provinces and cities across the country. Recently, Halcom Vietnam has expanded its consulting market to other countries in the region with the Sustainable Rural Infrastructure and Watershed Management Sector in Laos, funded by ADB.

CONSULTING FIELDS

            Survey, plan, design, manage projects                  Report making and supervising on implementation of         Training, communication and enhancing 

                    and supervise on construction                                  environmental and social safeguard policies                                      community awareness

            of urban and rural infrastructure works                        for development & poverty reduction projects

HIGHLIGHTED CONSULTING PROJECTS

No. Name of contract Time Funded by Project location
1 Preparation of Feasibility Study Report, Basic Design and Project total investment of Construction of Water Supply System in Nhon Hoi Economic Zone, Binh Dinh Province, phase 1A 11/2019 – 5/2020 Private Fund Binh Dinh
2 Topographical survey, geological survey, preparation of design and cost estimate of technical design of the management and operation route of Phuong Mai 3 wind power plant 11/2017 – 01/2018 Private Fund Binh Dinh
3 Preparation of Pre-feasibility Study and Feasibility Study for Transport Projects in Can Tho city 03/2015 – 03/2016 PPP Can Tho
4 Preparation of Investment Project Report, Detailed Design and Cost Estimate for Construction of Centralized Water Supply System for Dai Dong Thanh, Dinh To, Thanh Khuong, Xuan Lam, Ha Man Communes – Thuan Thanh district – Bac Ninh province 2014 Assistance budget & Private Fund Bac Ninh
5 Preparation of Working Drawings and Total Cost Estimate/Detailed Cost Estimate for Technical Infrastructure of New Urban Area in the South of Bac Giang city, Bac Giang province 09/2013 – 12/2013 Private Fund Bac Giang
6 Consulting Services of Adjustment of Investment Project Report for Hai Phong Solid Waste Management and Treatment Project

10/2013 – 12/2013

ODA from Korea Hai Phong
7 Preparation of Working Drawings and Total Cost Estimate/Detailed Cost Estimate for Technical Infrastructure of New Urban Area in the South of Bac Giang city 10/2013 – 12/2013 Private Fund Bac Giang
8 Consultancy Services of Survey and Project Preparation for Wastewater Collection and Treatment System in Cho Small Town, Yen Phong District, Bac Ninh Province 08/2013 – 10/2013 Private Fund Bac Ninh
9 Preparation of Working Drawings and Cost Estimate (outside the Dyke) for the Project of “Construction of Water Supply System for the Rest Area of Thanh Tri District” (managed by HAWACO) 10/2012 – 12/2012 State budget & Private Fund Ha Noi
10 Consultancy on Preparation of Working Drawings under Water Supply System Construction Investment Project in Ho Small Town, Thuan Thanh District, Bac Ninh Province 7/2011 – 9/2011 Private Fund Bac Ninh
11 Consultancy Services for water stations for lower Be River and Duc Hoa under Phuoc Hoa Water Resources Project 9/2011 – 4/2014 ADB Ho Chi Minh City
12 Preparation of feasibility study and Policy Framework for Vietnam Medium Size Cities Development Project of Lao Cai City 08/2010 – 01/2011 Domestic counterpart fund Lao Cai
13 Preparation of Construction Investment Report, Detailed Design and Bidding Document for Components 2 & 3 – Phase 2 under Coastal Cities Environmental Sanitation Project, Quy Nhon Sub-project 09/2009 – 10/2010 WB Binh Dinh
14 Consultancy on preparation of construction drawings – Construction of the 2nd raw water pipeline with DN1,000 from Quan Vinh pumping station to An Duong Water Plant 7/2009 – 9/2009 Private Fund Hai Phong
15 Preparation of Investment Project for Construction of Wastewater and Solid Waste Treatment at Jails, Education Centres and Teaching and Bringing up Schools under V26 Bureau – Ministry of Public Security 08/2008 – 10/2008 V26 Department – Ministry of Public security Ha Noi
16 Design Consulting Service – Package no. HY-DB-04: Design and Construction of Water Supply and Sewerage/Drainage System for Toan Thang Small Town, Kim Dong District, Hung Yen Province – Water and Sanitation Programme for Small Towns in Vietnam 6/2008 – 8/2008 Finnish Concessional Credit Hung Yen
17 Preparation of FS, Detailed Engineering Design and Bidding Documents for the Improvement of Trunk Infrastructure outside Tan Hoa – Lo Gom Basin (Component 2, Phase 2) under Vietnam Urban Upgrading Project, Ho Chi Minh City Sub-Project  11/2007 – 2012 WB Ho Chi Minh City
18 Update of the Feasibility Study of Bac Kan Town Water Supply and Sanitation Project, Kac Kan province 06/2007 – 12/2008 Finnish Concessional Credit Bac Kan
19 Preparation of Feasibility Study for Pleiku Drainage/Sewerage and Wastewater Treatment Project 06/2007 – 11/2008 Finnish Concessional Credit Buon Me Thuot
20 Detailed Design for Drainage & Sewerage Component under Haiphong Sewerage & Drainage and Solid Waste Management Project, Stage 1 (proposed loan from JBIC, Japan) 6/2007 – 12/2008 JBIC Hai Phong
21 Vietnam Urban Upgrading Project, Nam Dinh Sub-project – Package CP 7.2

03/2007 – 03/2008

WB Nam Dinh
22 Verification of engineering drawing and cost estimate for Project of Construction of Water Supply Network for Minh Khai, Tay Tuu and Thuy Phuong Communes, Tu Liem district 6/2011 – 7/2011 State budget & Private Fund Hanoi
23 Verification of engineering drawing and cost estimate, total cost estimate for Construction of Water Supply System and Installation of water meter for 6 wards in Hoang Mai district 3/2010 – 4/2010 State budget & Private Fund Hanoi
24 TA 9417-CS01- Output 3 Disaster Risk Financing for Hue – TA 47274-004-VIE: Mainstreaming Climate Resilience and Environmental Protection for Secondary Green Cities Development 08/2019 – 12/2020 ADB Thua Thien Hue
25 Technical Assistance for Water and Sanitation Programme for Small Towns in Vietnam (WSPST), phase 3 11/2013 – 12/2016 Finnish Concessional Credit Bac Kan, Cao Bang, Ha Giang, Hai Phong, Hung Yen, Thai Binh, Tuyen Quang, Yen Bai
26 Advisory Consultant Service under the Third Rural Transport Project (Additional Credit) 9/2013 – 6/2014 WB 33 provinces of Vietnam
27 Project Implementation Support Consultant for Comprehensive Socioeconomic Urban Development Project in Viet Tri, Hung Yen and Dong Dang 6/2013 – 12/2017 ADB Lang Son, Hung Yen, Viet Tri
28 Package DH-CB 3: Technical Assistance for Institutional Analysis, Development & Provision of Training Courses, Capacity Building & GIS/MIS Design for Service Provider – Dong Hoi City Sub-Project 07/2012 – 6/2014 WB Quang Binh
29 Project Preparation Technical Assistance Consultant for Greater Mekong Sub-Region (GMS) Corridor Town Development Project 05/2011 – 02/2012 ADB Quang Tri, Tay Ninh
30 Technical Assistance for Preparation of Construction Investment Report, Detail Design, Cost Estimation and Bidding Documents for 03 cities: Can Tho, Ca Mau, Rach Gia – Mekong Delta Region Urban Upgrading Project 01/2011 – 09/2011 WB Can Tho, Ca Mau, Rach Gia
31 Provincial Technical Assistance for Water and Sanitation Programme for Small Towns in Vietnam (WSPST) 11/2007 – 12/2008 Finnish Concessional Credit Thai Binh, Hung Yen, Bac Kan, Hai Phong, Yen Bai, Tuyen Quang, Ha Giang, Cao Bang
32 Construction Supervision under the Lot 19 of Cau Giay Water Supply Network Upgrading and Loss Reduction Project, Hai Ba Trung district 6/2021 – 12/2021 Private Fund Hanoi
33 Construction Supervision under the Lot 21 of Cau Giay Water Supply Network Upgrading and Loss Reduction Project, Hai Ba Trung district 6/2020 – 10/2020 Private Fund Hanoi
34 Construction Supervision under the Lot 5A, B of Cau Giay Water Supply Network Upgrading and Loss Reduction Project, Cau Giay district 8/2020 – 10/2020 Private Fund Hanoi
35 Construction Supervision on Water Supply System in the Inner Dyke Area under the Project of Water Supply System Construction for the Remaining Areas of Thanh Tri District (Areas managed by Hanoi Water Company) 02/2013 – 04/2014 Private Fund Hanoi
36 Construction of Water Supply System for Communes of Phu Dien, Minh Khai, Tay Tuu and Thuy Phuong (Tan Phong Hamlet), Tu Liem District, Hanoi City 08/2011 – 08/2012 City budget Hanoi
37 Construction Supervision for Packages No. 4, 5 and 6 under the Project of Construction of Water Supply Pipeline DN800 and Water Supply System in Hoang Liet Ward, Hoang Mai district, Hanoi 08/2011 – 11/2011 Private Fund Hanoi
38 Construction Supervision – Construction and Installation Packages No. 3, 4 and 5 under Thanh Tri District Water Supply System Improvement and Development Project (Development Planning Area in the East of the old National Highway 1A) 05/2011 – 12/2011 Private Fund Hanoi
39 Package No. 02 “Construction Supervision – Construction and Installation Packages No. 3 and 4 under Lien Mac Commune Water Supply System Construction Investment Project, Tu Liem District, Hanoi 05/2011 – 12/2011 Private Fund Hanoi
40 HU – CS01: Construction supervision – The Secondary Green Cities Development Project – Thua Thien Hue sub-project 10/2019 – 09/2022 ADB Thua Thien Hue
41 Package CT-CS4.19: Construction Supervision and Contract Management for LIA Upgrading Construction Packages including LIA 3,6 (CT-PW-1.3); LIA 7,8,16 (CT-PW-1.4); LIA 19, 25 (CT-PW-1.5) under Mekong Delta Urban Upgrading Project, Can Tho Sub-project 06/2015    
42 Package No.CSPH5: Construction Supervision and Contract Management for Construction Packages under Component 2, Phase 2, Vietnam Urban Upgrading Project, Can Tho Sub-project 7/2011 – 1/2014 WB Can Tho
43 Consulting services on contract management and technical supervision for construction of primary and secondary infrastructures (under Packages CP2, CP18 and CP19) – Component 2 – Nam Dinh Urban Upgrading Project 12/2010 – 01/2014 WB Nam Dinh
44 Construction Monitoring Component 4&5 – Phase 1 – Coastal cities environmental sanitation Project – Nha Trang Sub-project 12/2007 – 12/2008 WB Khanh Hoa
45 Vietnam Three Cities Project, Hai Phong Sub-Project (1B Drainage Project), funded by ODA from Finland (Phase 2) – Construction supervision 02/2006 – 12/2007 ODA from Finland Hai Phong
46 Consultancy on contract management and construction supervision for Components 1, 2 (partly) and 3, Phase I under Nam Dinh Urban Upgrading Project 01/2006 – 06/2008 WB Nam Dinh
47 Vietnam Urban Upgrading Project (VUUP), Hai Phong Sub-project, funded by WB – Contract management and contruction supervision for resettlement and housing area for the poor 09/2005 – 09/2007 WB Hai Phong
No. Name of contract Time Funded by Project location
1

SRIWSM-OP5-CS06: External/Independent Safeguard Monitoring under the Sustainable Rural Infrastructure and Watershed Management Sector Project

08/2021 – 08/2026 ADB Luang Prabang (LPB), Xayaboury (XBY), Xiengkhouang (XK) and Houaphan (HPN) – Lao PDR
2 HD-CS-02: Independent environmental and resettlement monitoring under the Dynamic Cities Development Project – Hai Duong City, Hai Duong Province 09/2021 – 06/2025 WB

Hai Duong

3 LX- CS-04: Independent resettlement monitoring consultant under the Vietnam Urban Upgrading and Expansion Project – Long Xuyen City Subproject

5/2020 – 5/2024

WB An Giang
4 QN-1.25 – Environmental and social safety monitoring consultancy – Sustainable environment project in coastal cities – Quy Nhon city subproject 8/2019 – 12/2022 WB Bình Định
5 Preparation of Environmental – Social Safety documents under the Urban Water Supply and Wastewater Project – Component 2C – Technical Assistance Project for Preparation of Safety Water Supply Project in Mekong Delta 9/2018 – 4/2019 WB An Giang, Hau Giang, Soc Trang, Bac Lieu, Ca Mau, Kien Giang Can Tho City
6 Consultancy Services in Safeguard Policies for Binh Dinh Dam Rehabilitation and Safety Improvement Component Project under Vietnam Dam Rehabilitation and Safety Improvement Project (DRSIP); funded by WB   9/2017 – 12/2017 WB Binh Dinh
7 Preparation of Resettlement Plan, Initial Environmental Examination (IEE), Environmental Management Plan (EMP) for Efficiency Energy Project in Urban Area, Electric Grid Improvement Sub-project in Western Hanoi – Phase 2 3/2017 – 5/2017 ODA from German Government Hanoi
8 Preparation of Environmental Impacts Assessment and  Resettlement Action Plan for Detailed Design of Renovation and Upgrading of the Road Linking Gia Minh Solid Waste Treatment Complex with Hai Phong Ceement Plant under Hai Phong city Sewerage & Drainage and Solid Waste Management Project 3/2017 – 5/2017 JICA Hai Phong
9 Package C3: External Resettlement Monitoring Consulting Services, GMS Ben Luc – Long Thanh Expressway Technical Assistance Project 5/2013 – 4/2016 ADB Long An, Dong Nai, HCMC
10 VH4-03: Independent Environmental and Social Monitoring, Medium Sized Cities Development Project, Vinh City Sub-project 4/2013 – 4/2018 WB Nghe An
11 External Monitoring of Resettlement Implementation – Strengthening Water Management and Irrigation System Rehabilitation Project 9/2012 – 12/2015 ADB Hai Duong, Hung Yen, Bac Ninh
12 Consultancy Services in Safeguard Policies for Sustainable Rural Infrastructure Development Project in the Northern Mountain Provinces 4/2012 – 4/2013 ADB Ha Giang, Cao Bang, Bac Kan, Tuyen Quang, Lao Cai, Yen Bai, Thai Nguyen, Lang Son, Bac Giang, Phu Tho, Dien Bien, Lai Chau, Son La, Hoa Binh, Vinh Phuc 
13 Preparation of Environmental and Social Assessments for Da Nang Sustainable City Development Project 3/2012 – 9/2013 WB Da Nang
14 Urban Wastewater Collection and Treatment Project in Ha Dong and Son Tay – Package: Implementation of Socio-economic Surveys, Wastewater Connection Commitments Surveys from Household and Preparation of Resettlement Plan; Implementation of Environmental Surveys and Preparation of Environmental Impact Assessment Report 12/2011 – 5/2012 ODA from French government Hanoi
15 Preparation of Environmental Impact Assessment (EIA), Environmental Management Plan (EMP, Resettlement Plan (RP) – Mekong Delta Region Urban Upgrading Project, Rach Gia City Sub-project 4/2011 – 9/2012 WB Kien Giang
16 Periodically independent monitoring and evaluation of the implementation of the Environmental Management Plan / Disaster Risk Management Project 10/2009 – 08/2010 WB Nghe An, Thanh Hoa, Ben Tre, Dong Thap, Quang Tri, Quang Nam, Quang Ngai, Ha Tinh, Quang Binh, Thua Thien Hue, National railroad
17 Preparation of Environmental Impact Assessment Report, Resettlement Policy Framework and Resettlement Action Plan under Hai Phong Urban Transport Development Project 2/2009 – 7/2009 WB Hai Phong
18

Environmental monitoring consultant phase 1 & 2/ Vietnam Urban Upgrading project (VUUP) – Ho Chi Minh City subproject

10/2005 – 10/2011   Ho Chi Minh City
No. Name of contract Time Funded by Project location
1 Package QN-6.6: Assistance to Relevant Departments and Agencies under Coastal Cities Environmental Sanitation Project, Quy Nhon City Sub-project 8/2013 – 8/2014 WB Binh Dinh
2 Monitoring and Evaluation of Chemically Enhanced Wastewater Treatment Model, Propagation for Replication of Model Results under Wastewater Treatment Plant Project – Coastal Cities Environmental Sanitation Project, Quy Nhon City Sub-project 01/2009 – 06/2012 WB Binh Dinh
3 Technical Assistance for Clean Health Cities Partnership – Program Design and Monitoring & Evaluation for Phase 1 – Coastal Cities Environmental Sanitation Project: Nha Trang, Quy Nhon, Dong Hoi 01/2009 – 06/2012 WB Quang Binh, Khanh Hoa, Binh Dinh
4 Technical Assistance for the PMU in Change of Sanitary Habit, Practice and Community Health Improvement –  Project of Rural Water Supply and Sanitation for Red River Delta – Thai Binh & Nam Dinh Sub-projects 01/2008 – 01/2013 WB Thai Binh, Nam Dinh
5 Vietnam Urban Upgrading Project – Hai Phong Sub-project – Consultancy on Training and Capacity Building for Officials of Districts, Wards and Public Service for Tertiary Infrastructure O&M 06/2007 – 04/2008 WB Hai Phong